POLDI HÜTTE: INSTALACE HLAVY A BERANU S OSAZENÍM HYDRAULICKÝCH PÍSTŮ NA KOVACÍM LISE STG 4000

POLDI HÜTTE: INSTALACE HLAVY A BERANU S OSAZENÍM HYDRAULICKÝCH PÍSTŮ NA KOVACÍM LISE STG 4000

POLDI HÜTTE: INSTALACE HLAVY A BERANU S OSAZENÍM HYDRAULICKÝCH PÍSTŮ NA KOVACÍM LISE STG 4000

Projekt

CIE METAL VALAŠSKÉ MEZIŘÍČÍ: TRANSPORT A MONTÁŽ LISU WEINGARTEN 2500

MÍSTO REALIZACE

CIE METAL VALAŠSKÉ MEZIŘÍČÍ

DATUM REALIZACE

PRVNÍ KVARTÁL ROKU 2017

OBJEDNAVATEL

CIE METAL

INVESTOR PROJEKTU

CIE METAL

VYKONAVATEL PROJEKTU

KNAP INDUSTRIETECHNIK, AJM AUTOJEŘÁBY

SPODNÍ STŮL

DÉLKA 11,6M      ŠÍŘKA 4,4M      VÝŠKA 2,5M      HMOTNOST 120T

ZAVÁŽECÍ STŮL 2x

DÉLKA 4,2M      ŠÍŘKA 4,6M      VÝŠKA 1M      HMOTNOST 29T

CENTRÁLNÍ SLOUP

DÉLKA 5,4M      ŠÍŘKA 5,6M      VÝŠKA 1,2M      HMOTNOST 32T

BOČNÍ SLOUP 2x

DÉLKA 5,4M      ŠÍŘKA 5,6M      VÝŠKA 1M      HMOTNOST 23T

BERAN 2x

DÉLKA 4,3M      ŠÍŘKA 3M      VÝŠKA 3,3M      HMOTNOST 80T

KORUNA

DÉLKA 11,6M      ŠÍŘKA 4,4M      VÝŠKA 3,1M      HMOTNOST 260T

CELKOVÉ ROZMĚRY LISU WEINGARTEN 2500 PO KOMPLETNÍM NASTROJENÍ

DÉLKA 11,6M      ŠÍŘKA 4,4M      VÝŠKA 11M      HMOTNOST 750T

1

Fáze 1

  • Návoz technického vybavení na realizační místo projektu

DSC00398
DSC00400
DSC00401
DSC00402
DSC00403
DSC00405
DSC00406
DSC00407
DSC00408
DSC00409
2

Fáze 2

  • Naložení autojeřáb 1x250t 1x160t na SPMT transport a ustavení spodního stolů do základového prostoru Lift Systems 24A-48A

01
02
03
04
05
06
07
08
10
11
3

Fáze 3

  • Naložení autojeřábem 1x250t 1x160t na SPMT transport a montáž zavážecích stolů a všech sloupů Lif Systems 24A-48A

01
02
03
04
05
06
07
08
09
10
4

Fáze 4

  • Naložení autojeřábem 1x250t 1x160t na SPMT transport a usazení koruny Lif Systems 24A-48A

01
02
03
04
05
06
07
08
09
10