POLDI HÜTTE: INSTALACE HLAVY A BERANU S OSAZENÍM HYDRAULICKÝCH PÍSTŮ NA KOVACÍM LISE STG 4000

POLDI HÜTTE: INSTALACE HLAVY A BERANU S OSAZENÍM HYDRAULICKÝCH PÍSTŮ NA KOVACÍM LISE STG 4000

POLDI HÜTTE: INSTALACE HLAVY A BERANU S OSAZENÍM HYDRAULICKÝCH PÍSTŮ NA KOVACÍM LISE STG 4000

Projekt

LASSELSBERGER keramika CHLUMČANY: TRANSPORT A USTAVENÍ LISŮ SACMI 1400, SITI MAGNUM 1400

MÍSTO REALIZACE

RAKO RAKOVNÍK, LASSELSBERGER CHLUMČANY

Datum realizace

TŘETÍ KVARTÁL ROKU 2013

OBJEDNAVATEL

SERVIS CHLUMČANY

INVESTOR PROJEKTU

LASSELSBERGER CHLUMČANY

VYKONAVATEL PROJEKTU

KNAP INDUSTRIETECHNIK

SACMI

DÉLKA 2,7M      ŠÍŘKA 2M      VÝŠKA 6M      HMOTNOST 65T

SITI MAGNUM

DÉLKA 2,6M      ŠÍŘKA 1,8M      VÝŠKA 5,8M       HMOTNOST 55T

1

Fáze 1

  • Transport a ustavení Lift systems 22A-44A lisu Sacmi mezi Rakovníkem a Chlumčany

1
2
3
4
5
6
7
8
2

Fáze 2

  • Položení Lift systems 24A-48A a vyvezení před halu lisu Siti Magnum

20131218155604
20131218160757
20131219093931
20131219094004
20131219115049
20131219115054
20131219115209
20131219115219
20131219133721
20131219133744
3

Fáze 3

  • Vyvezení ze skladu interní transfer po závodě a ustavení lisu Lift systems 24A-48A na bývalou pozici lisu Siti Magnum